Full Sub-Structure & Groundworks Package

Tool Station/ Screwfix, Hamilton

Site Preparation - Foundations

Attenuation Tank installation

Attenuation Tank installation

Attenuation Tank preparation

Site Preparation

Completed Project

Complete groundworks package encompassing advanced earthworks, drainage networks, a large attenuation tank installation, certified gas membrane, concrete floor slabs, and associated hard landscaping.

Phased Progress

Project Overview

Technical Highlights

  • Drainage & Stormwater Management: Executed drainage networks coupled with the installation of a large-capacity attenuation tank system to handle site-wide surface water run-off.

  • Structural Foundations & Steel Interfacing: Engineered high-tolerance foundations and cast-in bolt boxes, precisely aligned to receive incoming structural steel frameworks.

  • Environmental Protection: Deployed certified gas protection membranes below the floor slabs.

  • Slab Construction: Managed full sub-base formation, blinding, and preparation for two large reinforced concrete floor slabs.